Projects

The selection of a competent swimming pool engineering contractor is of paramount importance for the successful delivery of a project. Particularly where swimming pools, water features and associated wet leisure facilities are involved.

From initial design calculations, and functional design specifications to project planning we have the experience. The benefit of this experience is always shared. This means that we can provide an understanding of the swimming pool elements of a project.

Brio group offer a range of services in the process such as

  • Plant Room Audits
  • Technical specification of renovation
  • Tender Specification and Scoring
  • Project Supervision and Comission
  • Project Supervisor Design Process (PSDP)

To see below details of some of our recent project works.

Client: Altnagelvin Hospital, Londonderry

Completion: Apr 2021

Project details:

The hydrotherapy pool plant room within Altnagelvin hospital was relocated from a the basement level to a new pool plant room constructed, at ground level, in the vicinity to the hydrotherapy pool. 

Our role:

  • Redesign of the filtration and circulation system for relocation to new pool plant room
  • Specification of installation to include new filter capacities and new AFM Media
  • Source and Supply of Filters, Pumps, VSD and Filter Media
  • Support building team
  • Commissioning of New Plant Room 

Client: National Aquatic Centre, Dublin

Completion Date: March 2020

Project details:

Renovation of the competition standard pool 6 x filter system, containing 13 tonnes per filter of media. 

Our role:

  • Development of technical specifications for the renovation of the 6 x Competition Pool filters
  • Creation of Tender Specifications, and undertaking Scoring
  • Appointed Project Supervisor Design Process (PSDP) 
    • Health and Safety Assessments
    • H&S Works Documentation
    • Works Progress Inspections
    • Completion Inspections
    • Completion Documentation and sign off

 

Client: National Aquatic Centre, Dublin

Completion Date:  Current Project

Project details:

Installation of appropriate well water treatment system to utilise well water supplies within the complex in a safe manner. 

Our role:

  • Development of technical specifications for the treatment and filtration of well water supplies. 
  • Installation drawings
  • Creation of Tender Specifications, and undertaking Scoring
  • Appointed Project Supervisor Design Process (PSDP) 
    • Health and Safety Assessments
    • H&S Works Documentation
    • Works Progress Inspections
    • Completion Inspections
    • Completion Documentation and sign off

Client: National Aquatic Centre, Dublin

Completion Date: Current Project

Project details:

Installation of Ultraviolet Light secondary treatment system on the 50m Competition Pool. 

Our role:

  • Development of technical specifications of untraviolet light installation. 
  • Creation of Tender Specifications, and undertaking Scoring
  • Appointed Project Supervisor Design Process (PSDP) 
    • Health and Safety Assessments
    • H&S Works Documentation
    • Works Progress Inspections
    • Completion Inspections
    • Completion Documentation and sign off